We had our basement flooring installed today over 2 weeks ahead of the original schedule they gave us. So we are quite excited to have it done before we
go away on our trip (March 10-17.) The 3 installers arrived about 8 AM this morning and were all done by about 3 PM. We ordered
Tarkett Fiberfloor in a Cherry Spice wood grain pattern. It is similar to a thicker vinyl flooring but instead of a felt backing it has an
inner layer of fiberglass and a water proof and mould resistant foam backing. After final measurements 2 installers went back to the shop to cut the flooring pieces while one installer was finishing up filling cracks and small holes in the concrete floor. We had investigated laminate flooring originally but it would have need much more extensive leveling of the concrete floor. And our stairs would have been a major problem to put laminate on the way they were built.
We got the same flooring all the way from the bedroom at one end through the family room and the hall and closet and storage room to the bathroom at the other end. We had chosen the paint colours to coordinate with the flooring colour. We are very happy about how it turned out.
The same flooring was installed on the stairs along with nickel-plated metal nosings. The picture shows the before and after for the stairs. How well it would go on our type of stairs that were in rough shape was one of the reasons we chose this flooring.
Now that the flooring is in we can get the toilet and vanity/sink installed in the bathroom. The plumber said he can come next week. And the electrician will be back maybe tomorrow to install more light fixtures. The work is now into the home stretch ....
4 comments:
Wow, looks so good!
Looks wonderful. Is your basement totally finished now?
We are getting close to being finished. Remaining work - light fixtures, hook up bathroom fixtures, doors, baseboards and trim, suspended ceiling in bathroom and hall and storage room.
Thanks for sharing this with us! Some really amazing features.